Date: 2019 to 2021
Contracting entity: BMW Plant Construction
End customer/site of installation:  BMW Leipzig

Project description:

  • Entire electric planning (hardware construction, software project planning)
  • Control cabinet construction 
  • Provision of control technology
  • Assembly and installation 
  • Robot programming 
  • Commissioning

Technologies (excerpt):

  • 8 pieces S7-1500 with CPU 1518F – PN/DP
  • 8 pieces Visualization with WinCC on PC 677
  • 22 pieces Control units with WinCC visualization
  • 53 pieces FANUC industrial robots

The scope also comprises the complete BestFit system, including hardware, software, engineering, and commissioning