Car Body Framework and Front Flap: Shell – U11 (Integration and New Systems)

Date: 2019 to 2021
Contracting entity: BMW Plant Construction
End customer/site of installation: BMW Regensburg

Plants such as:

  • Body carcass 1, Body carcass 1 – AS, WL, HFR (integration)
  • Body carcass 2, Body carcass 2 – AS (integration)
  • Body carcass 3, Body carcass 3 – AS (integration)
  • Roof system (integration)
  • Front flap (new system)
  • Measuring cells GOM (new system)

Project description:

  • Entire electric planning (hardware construction, software project planning)
  • Control cabinet construction 
  • Provision of control technology
  • Assembly and installation 
  • Robot programming 
  • Commissioning

Technologies (excerpt):

  • 30 pieces S7-400 with CPU 416
  • 30 pieces Visualization with Zenon on PC 627
  • 50 pieces Control units with Zenon visualization
  • 250 pieces ABB IRC5 industrial robots (integration)