Body Carcass and Side Frame V8: Shell – G72 (Integration)
Date: 2023 to 2024
Contracting entity: TMS Turnkey Manufacturing Solutions GmbH
End customer/site of installation: BMW Dingolfing
Plants such as:
- Body carcass 1 (integration)
- Body carcass 2 (integration)
- Body carcass 3 (integration)
- Body carcass 3 – welding (integration)
- Side frame – inside (integration)
- Side frame – middle (integration)
- Side frame – outside (integration)
Project description:
- Entire electric planning (hardware construction, software project planning)
- Control cabinet construction
- Provision of control technology
- Assembly and installation
- Robot programming
- Virtual commissioning, physical system start-up
Technologies (excerpt):
- 18 pieces S7-1500 with CPU 1518F – PN/DP
- 18 pieces Visualization with WinCC on PC 677
- 35 pieces Visualization with WinCC on PC 477E
- 70 pieces Control units with WinCC visualization
- 76 pieces KUKA KRC4 industrial robots … in the body carcass range
- 60 pieces KUKA KRC4 industrial robots … in the side frame range