Body Carcass and Front Flap: Shell – U10 (Integration and New Systems)
- Date: 2021 to 2023
- Contracting entity: BMW Plant Construction
- End customer/site of installation: BMW Regensburg
Plants such as:
- Body carcass 1, Body carcass 1 – AS, WL, HFR (integration)
- Body carcass 2, Body carcass 2 – AS (integration)
- Body carcass 3, Body carcass 3 – AS (integration)
- Roof system (integration)
- Front flap (new system)
- Measuring cells GOM (new system)
Project description:
- Entire electric planning (hardware construction, software project planning)
- Control cabinet construction
- Provision of control technology
- Assembly and installation
- Robot programming
- Commissioning
Technologies (excerpt):
- 28 piecesS7-400 with CPU 416
- 28 pieces Visualization with Zenon on PC 627
- 40 pieces Control units with Zenon visualization
- 235 pieces ABB IRC5 industrial robots (integration)