Body Carcass and Front Flap: Shell – U10 (Integration and New Systems)

  • Date: 2021 to 2023
  • Contracting entity:  BMW Plant Construction
  • End customer/site of installation: BMW  Regensburg

Plants such as:

  • Body carcass 1, Body carcass 1 – AS, WL, HFR (integration)
  • Body carcass 2, Body carcass 2 – AS (integration)
  • Body carcass 3, Body carcass 3 – AS (integration)
  • Roof system (integration)
  • Front flap (new system)
  • Measuring cells GOM (new system)

Project description:

  • Entire electric planning (hardware construction, software project planning)
  • Control cabinet construction 
  • Provision of control technology
  • Assembly and installation 
  • Robot programming 
  • Commissioning

Technologies (excerpt):

  • 28 piecesS7-400 with CPU 416
  • 28 pieces Visualization with Zenon on PC 627
  • 40 pieces Control units with Zenon visualization
  • 235 pieces ABB IRC5 industrial robots (integration)