Skip to main content

Body carcass and side frame V8: shell – G60, G61, G90, G99, G32 (new systems and integration)

Date: 2019 to 2024
Contracting entity: BMW – plant engineering
End customer/site of installation: BMW Dingolfing

Plants such as:

G60 – KG1, KG2, KG3, KG-AS, HFR, WL I G60 – SR inside, middle, outside I G61 – KG1, KG2, KG3, KG-AS, HFR, WL I G61 – SR inside, middle, outside I G32 – SR inside, middle, outside I G6x – roof system

Project description:

  • Entire electric planning (hardware construction, software project planning)
  • Control cabinet construction 
  • Provision of control technology
  • Assembly and installation 
  • Robot programming 
  • Virtual commissioning, physical system start-up

Technologies (excerpt):

40 pieces S7-1500 with CPU 1518F – PN/DP | 40 pieces visualization with WinCC on PC 677 | 80 pieces visualization with WinCC on PC 477E | 100 pieces control units with WinCC visualization | 244 pieces KUKA KR C4 industrial robots in the range of body carcasses | 156 pieces KUKA KR C4 industrial robots in the range of side frames