Body carcass and side frame V8: shell – G72 (integration)
Date: 2023 to 2024
Contracting entity: TMS Turnkey Manufacturing Solutions GmbH
End customer/site of installation: BMW Dingolfing
Plants such as:
KG1 (integration) I KG2 (integration) I KG3 (integration) I KG3 welding (integration) | SR inside (integration) I SR middle (Integration) I SR outside (integration)
Project description:
- Entire electric planning (hardware construction, software project planning)
- Control cabinet construction
- Provision of control technology
- Assembly and installation
- Robot programming
- Virtual commissioning, physical system start-up
Technologies (excerpt):
18 pieces S7-1500 with CPU 1518F – PN/DP | 18 pieces visualization with WinCC on PC 677 | 35 pieces visualization with WinCC on PC 477E | 70 pieces control units with WinCC visualization | 76 pieces KUKA KR C4 industrial robots in the range of body carcasses | 60 pieces KUKA KR C4 industrial robots in the range of side frames