Skip to main content

Body carcass and side frame V8: shell – G72 (integration)

Date: 2023 to 2024
Contracting entity: TMS Turnkey Manufacturing Solutions GmbH
End customer/site of installation: BMW Dingolfing

Plants such as:

KG1 (integration) I KG2 (integration) I KG3 (integration) I KG3 welding (integration) | SR inside (integration) I SR middle (Integration) I SR outside (integration)

Project description: 

  • Entire electric planning (hardware construction, software project planning)
  • Control cabinet construction 
  • Provision of control technology
  • Assembly and installation 
  • Robot programming 
  • Virtual commissioning, physical system start-up

Technologies (excerpt):

18 pieces S7-1500 with CPU 1518F – PN/DP | 18 pieces visualization with WinCC on PC 677 | 35 pieces visualization with WinCC on PC 477E | 70 pieces control units with WinCC visualization | 76 pieces KUKA KR C4 industrial robots in the range of body carcasses | 60 pieces KUKA KR C4 industrial robots in the range of side frames